long program run times

I just made a program that has 43 minutes run time. That's the longest I have ever done for a single part. I did a Zeiss program that was 9 hours but it was for 20 parts at the same time. What is some of your run times?
Parents
  • Main Gearbox Housing for aircraft engine. Customer needed a full first article inspection.

    Took 4 solid weeks to program, 6hr CMM cycle time, 58page CMM report.

    This job literally had hundreds of true positions and many of the checks were redundant. If I had to guess, someone fresh out of engineering school sat at their desk and pushed the GD&T buttons as many times as they could before releasing these prints to us lol
Reply
  • Main Gearbox Housing for aircraft engine. Customer needed a full first article inspection.

    Took 4 solid weeks to program, 6hr CMM cycle time, 58page CMM report.

    This job literally had hundreds of true positions and many of the checks were redundant. If I had to guess, someone fresh out of engineering school sat at their desk and pushed the GD&T buttons as many times as they could before releasing these prints to us lol