hexagon logo

OUTTOLS Script help

I am using the OUTTOLS script found here but need help modifying it for my needs.

We have a part that gets checked on the CMM then data is written to a csv file to be uploaded to a customers database. However if a part has an OOT dimension we rework the part and check it again. I need a way to evaluate for an OOT condition and if there is one to NOT send any data to my csv file. How can I modify the aforementioned script to pass a variable back to PCD? I will then use that variable in an IF/THEN statement to determine whether or not to export the data. Thanks!
Parents
  • Wow this is old!

    This was only really designed to give me a total dimensions out count at the end of a part execution. I used to send this stuff to a database and track OOT dimensions over long periods of time based on part number. Chart it up at the end of the month, and the problem jobs pop out. The messagebox DID display the correct feature....when used with PC-DMIS 2009....
Reply
  • Wow this is old!

    This was only really designed to give me a total dimensions out count at the end of a part execution. I used to send this stuff to a database and track OOT dimensions over long periods of time based on part number. Chart it up at the end of the month, and the problem jobs pop out. The messagebox DID display the correct feature....when used with PC-DMIS 2009....
Children
No Data