hexagon logo

MCR20 module changing rack

Step by step installation or setup
In pc-dmis 2011
Note mcr20 doesn't appear in pc-dmis

Any info will be grate
Parents


  • Instructions still available? Cant seem to find it


    No sorry it's not, but it's fairly straightforward.

    Run the full calibration (Edit > Prefs > Probe Changer --- Calibrate Tab > Full Calibration)

    Follow the instructions. It's been a while but /I think you have to take 1 hit on the top of the metal section (lock the lids back first), then one on the front, then one on the inner left edge of the left hand port.

    You need to click Ok on the instructions before taking each hit.

Reply


  • Instructions still available? Cant seem to find it


    No sorry it's not, but it's fairly straightforward.

    Run the full calibration (Edit > Prefs > Probe Changer --- Calibrate Tab > Full Calibration)

    Follow the instructions. It's been a while but /I think you have to take 1 hit on the top of the metal section (lock the lids back first), then one on the front, then one on the inner left edge of the left hand port.

    You need to click Ok on the instructions before taking each hit.

Children
No Data