Hello All,

My company has recently run a program on two CMMs.
The first time the program was run, each loadprobe line would prompt the operator to load that probe before moving forward.
When the program was run on a different CMM, the program failed to notify the operator to change the probe.
I've been searching to see if there is a setting in the PC-DMIS software for this prompt to no avail.

Does anyone know what could be causing this difference in behavior?
Is there possibly a setting in the controllers of these CMMs?

Both machines are running the same version of PC-DMIS (2018 R2).
The machines are using different versions of a PH10. One with a PH10M Plus, and the other with a PH10MQ.

Thank you for your time.

P.S. We have added operator comments before all loadprobe lines to avoid this problem for now, but it would be nice to not have to insert a comment at every loadprobe.