hexagon logo

Best Way to do Alignment for Tubed Part

I want to see with everyone's expertise on how I should set up this alignment off the Datums. There is Datum Target A1 and A2. and Datum B. How should I Tackle this? Attached is a layout of the Datums. Thank you for any help.

Attached Files
Parents
  • A1/A2 = Cylinder evaluations
    B = Circle
    A1-A2 = Line for axis (Level/Origin = 4 DOF)
    B = Rotate about axis, origin along axis (=2DOF)
    You now have all 6 DOF handled.
    Beware, that the GDT reporting will not see all 6DOF controlled, it will only work for you in your alignment and legacy reporting.
Reply
  • A1/A2 = Cylinder evaluations
    B = Circle
    A1-A2 = Line for axis (Level/Origin = 4 DOF)
    B = Rotate about axis, origin along axis (=2DOF)
    You now have all 6 DOF handled.
    Beware, that the GDT reporting will not see all 6DOF controlled, it will only work for you in your alignment and legacy reporting.
Children