hexagon logo

Best Way to do Alignment for Tubed Part

I want to see with everyone's expertise on how I should set up this alignment off the Datums. There is Datum Target A1 and A2. and Datum B. How should I Tackle this? Attached is a layout of the Datums. Thank you for any help.

Attached Files
Parents
  • Points 1 and 2 will be on a curve, but I still hit the points coming straight down on them. Then 2 hits from the side pnts 4 and 5, then an end stop point if you will. I used pnt6 in the b datum, but you could use the end of the part if you think the length is close enough. Also for points 4 and 5 you could use holes with points in that direction. Its always worked for me. I don't do tubes very often anymore. but I'm sure it will at least help your machine find the part.
Reply
  • Points 1 and 2 will be on a curve, but I still hit the points coming straight down on them. Then 2 hits from the side pnts 4 and 5, then an end stop point if you will. I used pnt6 in the b datum, but you could use the end of the part if you think the length is close enough. Also for points 4 and 5 you could use holes with points in that direction. Its always worked for me. I don't do tubes very often anymore. but I'm sure it will at least help your machine find the part.
Children
No Data