I've searched for this as I know this has been discussed once or twice. Can you output the runtime of a program? Or track it somehow just bu executing a program?
We are running CMMs (machinists, QA techs) virtually around the clock and boss want to know if we can track this for a week or so to justify getting a person to just run parts for the machinists.
I used report editor
created a grid at the Bottom of each report
1 row with 2 columns
Typed "Path" in 1st cell
typed "=partname()" in 2nd cell
2nd row with 4 columns
"Program Name" "=partname()" " Serial # " "=sernum()"
3rd row with 8 columns
"Run Time" "=elapsedtime()" "Features Measured" "=nummeas()" "Out tolerance" "=numouttol()" " "Page" "=page()"
repeat as needed.
Adjust cell sizes
Group all Rows together
will try to type up better instructions but this will give you a start.
I used report editor
created a grid at the Bottom of each report
1 row with 2 columns
Typed "Path" in 1st cell
typed "=partname()" in 2nd cell
2nd row with 4 columns
"Program Name" "=partname()" " Serial # " "=sernum()"
3rd row with 8 columns
"Run Time" "=elapsedtime()" "Features Measured" "=nummeas()" "Out tolerance" "=numouttol()" " "Page" "=page()"
repeat as needed.
Adjust cell sizes
Group all Rows together
will try to type up better instructions but this will give you a start.