We have an internal feature that has no clocking datum, so we would like the Geotol to allow for a 'best fit'
But we would like to output XY based on an active alignment setup.
Is there a way to leave the degrees of freedom open in Geotol for the position check but then define a clocking XY rotation for the output for machinists to use?
I'm hoping after the 1st of the year to "move up" to a newer version. I've taken the GeoTol class and liked what I saw. We've got a lot of programs to run through the conversion utility before we make the jump.