hexagon logo

How To Handle Down CMMs?

Good Morning,

Let say your CMM is down and a tech is scheduled to go to your job site next week to troubleshoot and during that time your CMM in inoperable. What does your company do to keep production running when your CMM is not available? How do you all handle that? You don't have any other CMMs to take on the work. You aren't in a position to outsource the CMM inspections.

Thanks.

Parents
  • Fire up the surface plate and sine plates! 
    Ask your local Hexagon office if they have a loaner Romer arm to at least measure something. 
    3d print some contour templets on a $150 Ender 3 and hope for the best. 
    Walk to the shop next door and trade with them, maybe you have machine time and they have CMM time, work out a deal.

    My CMM is currently down for Refit. But we have a Leica, and 2 large Romers, and 3 old Red Romers as mothballed backups, and technically a Pocketgage Romer (it's so cute).  So, they just expect us to "get by" even if it takes 5x the time. 

Reply
  • Fire up the surface plate and sine plates! 
    Ask your local Hexagon office if they have a loaner Romer arm to at least measure something. 
    3d print some contour templets on a $150 Ender 3 and hope for the best. 
    Walk to the shop next door and trade with them, maybe you have machine time and they have CMM time, work out a deal.

    My CMM is currently down for Refit. But we have a Leica, and 2 large Romers, and 3 old Red Romers as mothballed backups, and technically a Pocketgage Romer (it's so cute).  So, they just expect us to "get by" even if it takes 5x the time. 

Children