How To Handle Down CMMs?

Good Morning,

Let say your CMM is down and a tech is scheduled to go to your job site next week to troubleshoot and during that time your CMM in inoperable. What does your company do to keep production running when your CMM is not available? How do you all handle that? You don't have any other CMMs to take on the work. You aren't in a position to outsource the CMM inspections.

Thanks.

Parents Reply
  • I program everything in V3.7, the Global uses 2016.  BUT, the only thing I have to watch for when migrating the programs is round slots and square slots.  Nothing else ever has any issues.  There are some minor things that may or may not need to be tweaked from machine/version to machine/version, but those are mostly how AUTOMOVE (avoidance move) works.  Center of probe to edge of probe difference between machines/versions, and it only needs tweaking in tight spots.