hexagon logo

True Position Axis Measurements Do Not Calculate to True Position Measurement

So I have a true position dimension on my report and I like to report the axis information so operators know when axis to adjust and by how much. 

My X axis deviation is 0.0044" and my Y axis is -0.005" if I run those 2 values through my TP calculator I get 0.0133" however PcDmis reported it to be 0.0153".

Am I doing something wrong? This dimension should be passing.

Parents Reply Children
No Data