Good afternoon all,
I am trying to set up a quick program to measure a true position call out for a part we are running at the shop. it is a small bushing and the TP call out is the O.D. cylinder to the I.D. cylinder (datum A) and a perpendicular…
I recently was tasked with measuring a part bent at an angle with a pattern of holes on both surfaces of the bend. The bottom plane is Datum A, the bottom pattern of holes is Datum B. There is a profile locating all of the edges on the bottom plane to…
Hello everyone!
last week i came across an issue in which first hole was mismarked during production.
The part was similar to attached image with two set of holes 1st set has 30 holes and 2nd has 59, in which 1st hole of both set are inline with each…
I have come across another issue that im having with exact measure ( i have not tried this on "geometric tolerance command" yet). The problem i am having is the datum shift when applied thru simultaneous evaluation (s.e.) is making erroneous datum shifts…
Need help!! Not sure why PC-DMIS keeps giving me bad results. I have created different alignments, different hits, different workplanes and views but PC-DMIS still gives me wrong numbers. Any suggestions on what is going on?
On the blueprint I have…
Hi guys this is my first post so forgive me if I miss out any information, I'm recently updated to version 2021.1 (from 2020 R2) and am having an issue with positional dimensions in the "text only" report format.
Everything is displayed fine when the…
Hello,
I am having trouble understanding how this TP callout can be out by so much. I attached a pic of what the report looks like and the code is shown below. Does anybody have any ideas? I have tried redoing the alignment but that did not…
dear all,
I am new guy for PCDMIS, currently I am using PC-DMIS rev 4.3 and 2012.
recently, I found a problem with a program for my product. it is about a true position of a circle, please refer to attached photo for details.
a circle which is…