hexagon logo

Inconsistent time step

Hello all,

I ran a simulation in adams/view that has contacts. I am using HHT integrator with error tolerance of 1.0E-05 and Hmax=1.0E-05. I put a step size of 0.0001. When I export a result spreadsheet, the time step is not consistent. I would like to know how I can get the result with a consistent time step of 0.0001.

Thank you in advance.

Seng

Parents Reply Children