hexagon logo

Reporting time

Management wants to create a load board for our quality department, so that they can see what we spend our time on and if we are worth keeping around. Lol so do you guys have to do something like this? If so how do you go about reporting? They have been trying to estimate how long it will take to create a program and measure parts based on size
Parents
  • Well I sure hope that you are getting prints from top of the line draftsmen that didn't just graduate from college. I'm currently staring at one with a profile callout on a large slot that has no dimensions, a section view that doesn't indicate where the section came from and a FCF floating out in space with no leader line calling out a boundary on two inline holes that probably don't exist. Sure glad that there's no timer on me.
Reply
  • Well I sure hope that you are getting prints from top of the line draftsmen that didn't just graduate from college. I'm currently staring at one with a profile callout on a large slot that has no dimensions, a section view that doesn't indicate where the section came from and a FCF floating out in space with no leader line calling out a boundary on two inline holes that probably don't exist. Sure glad that there's no timer on me.
Children