hexagon logo

CMM inspection planning and representing a strategy

Hi all

I’m a postgraduate student running a project on CMM inspection planning.
I’ve structured a short questionnaire for the project and I’d really appreciate it, if you would participate in this.
I'd really appreciate it, if you could forward it to any engineers with CMM experience, you might have in your personnel.

Link for the questionnaire: https://docs.google.com/forms/d/e/1FAIpQLSciHWi7oEN-NuMBckyGqmRE4CRJ2z2Ite2hX6nDcjMov48Img/viewform

Thank you in advance for your time and consideration.
Parents
  • Your thread title phraseology is cool, but here's a dose of reality: Engineers and CMM programmers can be like oil and water.
    Your university should have scheduled you more field trips to the real world. (read: CMM area)
    It's a good learn to see what reality is like down in the trenches, without all the podium-speak.
    Then, you could make up your own mind as to which way the wind blows.
    good luck
Reply
  • Your thread title phraseology is cool, but here's a dose of reality: Engineers and CMM programmers can be like oil and water.
    Your university should have scheduled you more field trips to the real world. (read: CMM area)
    It's a good learn to see what reality is like down in the trenches, without all the podium-speak.
    Then, you could make up your own mind as to which way the wind blows.
    good luck
Children