OK hopefully this doesn't apply to everywhere but the engineers here seem to think that anything that needs measuring must automatically go on a CMM.... It has annoyed me since I started but most of the time I can see at least a little semblance of logic behind their thinking.
That is until now.......... We have a distance to measure (the height of an insert), now with a depth mic this could be checked within 30 seconds but let's be generous and include the time for me to go into my toolbox and get my mic, so we'll call it 2 minutes. Lovely quick turnaround everyone is happy....... Nope instead it MUST be measured on the CMM (which is running at max capacity and is looking like a 1.5-2 week lead time until I can squeeze it in).
Now I've argued every which way possible that it's a waste of time and the parts have been sitting on my shelf for a few days now and I have admitted defeat, but it got me wondering!
What is the worst thing you guys/girls have had to measure on a CMM?
If this gets no replies my faith in the world may be restored a little but if this goes the way I think it will at least I'll know I'm not the only one suffering and crying into my pillow at night.
Stuff that impossible to check not on the CMM (or at least very very difficult) but they don't put it on the CMM because it might show errors. Seriously this place is shocking!
Stuff that impossible to check not on the CMM (or at least very very difficult) but they don't put it on the CMM because it might show errors. Seriously this place is shocking!
You must be one of those who check to reject....that's your real problem. Like your attitude has anything to do with whether the part is good or bad LOL!!!
I'm not sure which is worse! on a side note though Ninja, your badger is spreading!! I seen a Transit van the other day with him on and thought of you lol