I have engineers here that have basic dimensions to control true position callouts-and they have true position callouts on those basic dimensions also!! They got upset cause i told them it makes no sense.. I have a hole with a TP .005 to A and B, and i have basic dimensions from A and B and then TP .004 of these dimensions to A.. How does that make sense?? how am i supposed to even inspect that ...but what do i know!!
okay so i can't post the drawing cause i haven't quite figured out how to cover what shouldn't be shared, but this is what i mean. i didn't draw the B datum
okay so i can't post the drawing cause i haven't quite figured out how to cover what shouldn't be shared, but this is what i mean. i didn't draw the B datum