hexagon logo

Adding a Assembly section to my control plan and pfmea

I was wondering if anyone would be willing to share a control plan and pfmea with an added operation of assembly on it? Even just the section added to theirs to use for reference to make my own.
Parents
  • Hey or even Either one of you yahoos got a starter template for this? or davehocum <<<you're a nerd. You usually have stuff like thisRolling eyes


    We do not do assemblies in our plant. We typically have outside operations (grinding, annealing, plating, etc). and secondary operations (bending, machining, deburring, belt sanding, etc.).

    I would assume that you have routing operations, correct? Based on the print, you have the features that are affected by the assembly operation that are critical areas to check. With that operation, you have a process in which you will develop your PFMEA, which then drives your control plan. Shouldn't be too much different that a non-assembly CP & FMEA.
Reply
  • Hey or even Either one of you yahoos got a starter template for this? or davehocum <<<you're a nerd. You usually have stuff like thisRolling eyes


    We do not do assemblies in our plant. We typically have outside operations (grinding, annealing, plating, etc). and secondary operations (bending, machining, deburring, belt sanding, etc.).

    I would assume that you have routing operations, correct? Based on the print, you have the features that are affected by the assembly operation that are critical areas to check. With that operation, you have a process in which you will develop your PFMEA, which then drives your control plan. Shouldn't be too much different that a non-assembly CP & FMEA.
Children
No Data