Your Products have been synced, click here to refresh
I’m aware of the circular moves between hits, But a lot of our parts are 30in+ in diameter, and being we use readpoint alignments, operator error becomes an issue if they don’t have the part centered on the table. And my company is into such an array of different applications, we can’t use any kind of permanent fixturing. But, I do use the auto vector points quite often, so that’s actually an easier solution. Thanks for the input. I’ve just recently taken that 60 dollar online VB class on hexagons website, so I’m trying to practice to get more familiar with scripting in PCDmis.
I’m aware of the circular moves between hits, But a lot of our parts are 30in+ in diameter, and being we use readpoint alignments, operator error becomes an issue if they don’t have the part centered on the table. And my company is into such an array of different applications, we can’t use any kind of permanent fixturing. But, I do use the auto vector points quite often, so that’s actually an easier solution. Thanks for the input. I’ve just recently taken that 60 dollar online VB class on hexagons website, so I’m trying to practice to get more familiar with scripting in PCDmis.
© 2024 Hexagon AB and/or its subsidiaries. | Privacy Policy | Cloud Services Agreement |