So the issue I am haveing is when I do a loop of any sort and use PCD2EXCEL the first loop data will be reported, then when I run the 2nd loop both the first and 2nd will be reported so on and so on...
I there a way to have it and export only the most current loop data?
I have tried every way I could think of, even trying to get it to loop without being a loop, but I haven't been able to figure it out.