D6-51991 Requirements

We are updating our CMM manual to be compliant with D6-51991. Inspectors were here last week to watch how we ran the CMM and how we handle "Product Acceptance Software" verification. While they were here we identified areas that need attention. Once we get everything hammered out we will create work instructions and templates so that all programs are compliant moving forward.


Datum Alignment Verification:

Reporting position of a datum feature is simple enough. I've always programmed using the datum structure as my part alignment. Datum feature locations should be zero for the axis they origin. All well and good for legacy dimensions. I use, and would like to continue using, the Geometric Tolerance command. However, PC-DMIS doesn't always solve the datum structure the same way as the alignment I used, especially when a pattern of features is a datum. I am not smart enough, nor skilled enough to program the equations required manually to solve these datum structures just so that I can report the location of the datum as required by D6-51991. Is there some way to report the alignment that the demon calculates when using the GeoTol command? Will I be limited to using only the current alignment? I think this would be hurting ourselves when it came to datum shifts from MMB.


Datum Construction:

I know it's been asked a bunch before about constructing a datum plane from the three highest points. Can someone point me to a good example of the code needed to filter through a set of points and construct a plane with just the three highest points? Alternatively, Primary Datum Plane is a thing. I worry that it is going to construct a plane inside my part. How does this construction actually work? Does it use the workplane to construct the plane, the point vectors? I don't understand it well enough to trust it. Once I do I can explain why it's used instead of the looping command needed to filter through a bunch of points.


NIST test and the NIST Cert:

What does the NIST Test and Cert available from Hexagon actually tell me? Is the NIST Cert good for all builds of the version it is written for? The inspector would have accepted the cert for PAS if it had matched our installed build exactly.