91.5º appears as a reference dimension but maybe you have it toleranced somewhere else.
Measure lines in 4 quadrants and report their angle compared to -A- (make sure to view from the correct workplane when reporting)
Again the 357.55 is a reference and there is most likely a BASIC value in a different view that will tell you the distance from A or X that the diameter should exist.
91.5º appears as a reference dimension but maybe you have it toleranced somewhere else.
Measure lines in 4 quadrants and report their angle compared to -A- (make sure to view from the correct workplane when reporting)
Again the 357.55 is a reference and there is most likely a BASIC value in a different view that will tell you the distance from A or X that the diameter should exist.