When using BFRE on a constructed feature I need to be sure that it is done while the probe that was used for measuring is loaded.
This is correct, yes?
I also am believing that one cannot use BFRE when more than one probe is used to measure features used in a construction such as individual points measured for construction of a feature.
This is correct, yes?
I'm not 100% on this, but, I believe that used to be the case but isn't any longer.
I'm like 90% sure I tried this once (with two significantly different tip sizes) and it worked fine, but it would probably be worth trying it just to make sure.
I'm not 100% on this, but, I believe that used to be the case but isn't any longer.
I'm like 90% sure I tried this once (with two significantly different tip sizes) and it worked fine, but it would probably be worth trying it just to make sure.