hexagon logo

Alignment DEF


How would you go about creating the alignment for DEF? I am leveling Datum D and rotating E2 to E3 xplus. How would you origin E2 and E3? Would you create a point between them and origin that point in the X and Z? ​

Attached Files
Parents
  • Is there no definition/explanation of what datum E and F is on the drawing (what they consist of)?
    Datum F can be the large hole in the center or the larger bolt hole of the three.
    Datum E could be the rightmost bolt hole or a line through both of the bolt holes... if the line passed through both of them it would be more obvious, but they don't.

    I would probably have used the larger bolt hole or the center hole by the O-ring groove as datum F and the same as you for datum E.
Reply
  • Is there no definition/explanation of what datum E and F is on the drawing (what they consist of)?
    Datum F can be the large hole in the center or the larger bolt hole of the three.
    Datum E could be the rightmost bolt hole or a line through both of the bolt holes... if the line passed through both of them it would be more obvious, but they don't.

    I would probably have used the larger bolt hole or the center hole by the O-ring groove as datum F and the same as you for datum E.
Children
No Data