hexagon logo

Alignment DEF


How would you go about creating the alignment for DEF? I am leveling Datum D and rotating E2 to E3 xplus. How would you origin E2 and E3? Would you create a point between them and origin that point in the X and Z? ​

Attached Files
Parents
  • This is a better clip of the blueprint. I am using the large bolt hole as Datum F. I was going to create a mid point between E2 and E3 and use that to origin X and Z. So your saying to use Datum F as Datum E also? I could create an offset point with E2 and E3 to go 3.813 +Z and use that to origin X and Z?

    Attached Files
Reply
  • This is a better clip of the blueprint. I am using the large bolt hole as Datum F. I was going to create a mid point between E2 and E3 and use that to origin X and Z. So your saying to use Datum F as Datum E also? I could create an offset point with E2 and E3 to go 3.813 +Z and use that to origin X and Z?