hexagon logo

Does this Runout GD&T make any sense?

Utterly confused by this print, I'm guessing they want a runout of 0.008 between the major of the spline and the stock shaft OD but is this called out correctly? Thanks
Parents
  • The runout to itself does not make any sense. For the spline, datum A is not the OD, but the axis of the Ø1.496-1.500, but I would also interpret this as the runout of the spline Major Diameter relative to the axis of cylinder Datum A since it is attached to the Major. If it were attached to the spline callout, I would ask the customer what they want
Reply
  • The runout to itself does not make any sense. For the spline, datum A is not the OD, but the axis of the Ø1.496-1.500, but I would also interpret this as the runout of the spline Major Diameter relative to the axis of cylinder Datum A since it is attached to the Major. If it were attached to the spline callout, I would ask the customer what they want
Children
No Data