hexagon logo

Does this Runout GD&T make any sense?

Utterly confused by this print, I'm guessing they want a runout of 0.008 between the major of the spline and the stock shaft OD but is this called out correctly? Thanks
Parents
  • The rightmost runout is using the datum triangle to connect to the feature, is that datum A then?
    The leftmost runout has the datum not connected to the centerline, meaning that datum A is the surface (generatrix).

    I'd say you need clarification from the designer and a revised drawing.
Reply
  • The rightmost runout is using the datum triangle to connect to the feature, is that datum A then?
    The leftmost runout has the datum not connected to the centerline, meaning that datum A is the surface (generatrix).

    I'd say you need clarification from the designer and a revised drawing.
Children
No Data