Just as the title says, I am wanting to swap from our current setup to the TP20.
This morning I removed the SP25 scanning setup and placed on the TP20. After I did this, I was unable to get the CMM to move. Spoke to Renishaw and they said I need blanks to go on the end of the multiwire on the probe head? I'm not sure what I am needing to do.
Equipment used currently - PH10QM/SP25M/SP25-2 = PHC10-2 Probe Head Controller. PCDMIS 2020R1
I'm not sure what they are talking about. I have a PH10MQ and I can remove the SP25 and put the quick-change-to-8mm thread unit on and put the TP20 in it.
I'm not sure what they are talking about. I have a PH10MQ and I can remove the SP25 and put the quick-change-to-8mm thread unit on and put the TP20 in it.