Hi,
A while back I made a program for a Go/No-Go gage. Ran without a hitch. fast forward two months down the line. I needed to check another (same gage) that was manufactured. However, Pc DMIS takes the first hit without a problem. The second hit, it makes contact and keeps going untill it errs out.
Program used to work fine. Can't wrap my head why it doesn't all of a sudden. Any ideas?
Thanks for your insight.