I have an old drawing with datum modifiers, can I add bonus tolerance from the datums modifiers and not check them simultaneously?
Your Products have been synced, click here to refresh
I have an old drawing with datum modifiers, can I add bonus tolerance from the datums modifiers and not check them simultaneously?
Simultaneous evaluation has been a relevant (implied) factor of ASME for many revisions, but I think it first showed up with its own paragraph/section in 1994:
1994 it's para 4.5.12
In 2009 it is in para 4.19
Simultaneous evaluation has been a relevant (implied) factor of ASME for many revisions, but I think it first showed up with its own paragraph/section in 1994:
1994 it's para 4.5.12
In 2009 it is in para 4.19
© 2024 Hexagon AB and/or its subsidiaries. | Privacy Policy | Cloud Services Agreement |