hexagon logo
  • Help inspecting profiles with screwy datum

    I have been given a part to inspect with the model. It has a surface profile w/in .0005, but I don't see how these datums really make sense. At first read I thought that -A- was the center hole, which would make -C- redundant. The engineer told me…