Good afternoon all,
I am trying to set up a quick program to measure a true position call out for a part we are running at the shop. it is a small bushing and the TP call out is the O.D. cylinder to the I.D. cylinder (datum A) and a perpendicular…
Hello everyone
I need to inspect TP of a tapered through hole on a cylindrical surface at a distance of R. 10.4 from center of part as shown in image,
any thoughts on how this can be inspected..
Attached Files
Hi there,
I need help. I've received a ASME drawing in inches from a client (i usually work on ISO and with mm) and they've demanded that I measure a position with the MMC condition in the hole and for each datums (B and C).
The thing is that i…
I Have trouble when showing True Position on FCF,
There is some information i want to hide or delete, that is location on Datum which shown in Position tab, that information come when i add secondary and tertiery datum with MMC or LMC on True Position…