hexagon logo

Browse By Tags

  • report evaluation

    I came across a note on drawing which says 50% of the holes may exceed the drawing by 0.0003 10% of the holes may exceed the drawing by 0.005 if each of these are separated by at least (5) holes no more than 0.0003 over max this needs to be checked…