Your Products have been synced, click here to refresh
Yes v3.7 does report the run time at the footer. If you aren't seeing it you'll have to add it to the logo.dat file.
You can use this command line somewhere on your report template to show the run time:
=ELAPSEDTIME()
Not running 4.2MR1 on the floor. CMMs are still running V3.7MR3 and I don't think this will work this way.
In V3.7MR3 I've tried playing with this as an input, tried assigning it, don't know where or what to use with it. Just a little more detail please.
Can I pull the time off the footer and send it to a file?
END OF MEASUREMENT FOR PN=#PARTN DWG=#DRWN SN=#SERIALN TOTAL # OF MEAS =#NMEAS # OUT OF TOL =#NOUT # OF HOURS =#ELAPSTIM
=elapsedtime()
=nummeas()
=numouttol()
=filename()
=partname()
=page()
=revnum()
=sernum()
=statcount()
=Page() +" "+ LOWERCASE(LOADSTR(-564)) +" "+ Pages()
I used report editor
created a grid at the Bottom of each report
1 row with 2 columns
Typed "Path" in 1st cell
typed "=partname()" in 2nd cell
2nd row with 4 columns
"Program Name" "=partname()" " Serial # " "=sernum()"
3rd row with 8 columns
"Run Time" "=elapsedtime()" "Features Measured" "=nummeas()" "Out tolerance" "=numouttol()" " "Page" "=page()"
repeat as needed.
Adjust cell sizes
Group all Rows together
will try to type up better instructions but this will give you a start.
Not running 4.2MR1 on the floor. CMMs are still running V3.7MR3
THIS IS FINE IF I AM RUNNING V4.0 OR HIGHER BUT THIS DOESN'T WORK WITH V3.7MR3
see MY post ( http://pcdmisforum.com/showthread.php?p=148293#poststop ) it tells you what you need for PRE V4, meaning V3.7 MR4 and earlier.
© 2024 Hexagon AB and/or its subsidiaries. | Privacy Policy | Cloud Services Agreement |