What is the difference?
11 November 2013: Stephan Conrad
Since the publication of the 4th edition of the AIAG Core Tool MSA reference manual, there is one modification that has given the participants…
Expert insights into this complex topic
21 November 2011: Stephan Conrad
The days when calculation methods were explained with the help of a thumbnail sketch and some ranges are long gone. Back…
"Capable", "stable" and "in control" muddy the waters
23 October 2017: Wolfgang Schultz
While discussing the issue of process capability, we always have to face the three terms given in the title…
03.11.2015: Stephan Conrad
About similarities and differences
Who is not familiar with the famous statement about the art of measuring: “The one who measures, measures crap “. The most crucial question…
28.02.2017: Stephan Conrad
Just a few clicks to reveal the absolute truth or rather "do not trust any statistic..."?
`Evaluation strategy´ is the magic word in Q-DAS software products qs-STAT, solara…
Considering that many company guidelines have already been adapted to VDA 5 and ISO 22514-7, there are still some open questions...
13 November 2017: Stephan Conrad
Nowadays, measurement process…
Have a look at some aspects that still leave room for interpretation.
04 August 2017: Stephan Conrad
Nowadays, measurement process capability according to VDA Volume 5 and/or ISO 22514-7 is well…
What does process capability actually mean?
21 April 2016: Wolfgang Schultz
Process capability describes the ability of a (production) process to produce characteristics meeting the specifcation…
04.08.2015: Morteza Farmani
Find out why
Many participants of our seminars on measurement system analysis and measurement uncertainty studies ask about the tolerance needed to apply specific measuring…
03.06.2015: Stephan Conrad
Look what is behind this mysterious statistic
Since the third edition of the AIAG Core Tool MSA 2002 manual has been published in 2002, the subject of ndc keeps haunting…