I want to see with everyone's expertise on how I should set up this alignment off the Datums. There is Datum Target A1 and A2. and Datum B. How should I Tackle this? Attached is a layout of the Datums. Thank you for any help.
A1/A2 = Cylinder evaluations
B = Circle
A1-A2 = Line for axis (Level/Origin = 4 DOF)
B = Rotate about axis, origin along axis (=2DOF)
You now have all 6 DOF handled.
Beware, that the GDT reporting will not see all 6DOF controlled, it will only work for you in your alignment and legacy reporting.
When i manually measure Datum B and then measure the 2 outside cylinders, I created a plane (Mid Point) and did YPlus and leveled , I then rotate Datum B and then Translate the 2 remaining axis to Datum B, My Datum B is off in space. So i'm doing something incorrectly.
When i manually measure Datum B and then measure the 2 outside cylinders, I created a plane (Mid Point) and did YPlus and leveled , I then rotate Datum B and then Translate the 2 remaining axis to Datum B, My Datum B is off in space. So i'm doing something incorrectly.